Webb Distribution Site – Avonmouth

Client: AMC
Location: Webb Distribution Site, Avonmouth, BS11 9YS
BR Job Reference: BR125
Works: Removal of Asbestos Insulating Board (AIB) and bitumen adhesive
Quantity: 84m² AIB and 20m² bitumen adhesive
Asbestos Fibre Type: Amosite

Project Overview

BR Asbestos Limited was appointed by AMC to undertake asbestos remediation works at the Webb Distribution Site in Avonmouth.

The project involved the controlled removal of approximately 84m² of asbestos insulating board (AIB) together with 20m² of bitumen adhesive. The AIB was recorded as containing amosite asbestos, requiring carefully controlled removal arrangements and stringent site management. ASBvisual-Handover-Completion-G…

The works covered both a substantial industrial/warehouse area and smaller internal areas. Due to the scale and nature of the project, careful planning was required to ensure the asbestos works could be completed safely while maintaining effective segregation from surrounding areas.

Site Set-Up & Containment

Prior to removal works commencing, BR Asbestos established controlled work areas with suitable barriers, signage and sealed access points.

As shown throughout the photographic record, a substantial timber-framed and polythene enclosure was constructed within the warehouse, incorporating controlled access arrangements and asbestos warning signage. Airlock arrangements, negative pressure equipment and segregated waste arrangements can also be seen within the site set-up photographs.

The report confirms that the required service isolation certificates were in place prior to the asbestos removal works commencing. ASBvisual-Handover-Completion-G…

Asbestos Removal Works

Once the controlled areas had been established, BR Asbestos carried out the removal of the identified asbestos-containing materials in accordance with the agreed plan of work and site controls.

In total, the project involved the treatment/removal of:

  • 84m² asbestos insulating board
  • 20m² bitumen adhesive
  • Amosite-containing AIB

Following removal, all affected areas were thoroughly cleaned and inspected. The completion documentation confirms that the work areas were free from dust and debris and that the identified asbestos-containing materials had been removed or treated. ASBvisual-Handover-Completion-G…

Inspection & Handover

A detailed visual inspection was undertaken prior to handover. This included checking floors, walls, high-level surfaces, ledges, sills, voids, cables, wiring, pipework, ducting and equipment remaining within the controlled area.

All recorded inspection points were confirmed as visually clean and free from asbestos contamination. The inspection ran from 11:18 to 13:18 on 20 June 2025. ASBvisual-Handover-Completion-G…

Following inspection, BR Asbestos certified the enclosure/work area as visually clean and ready for reoccupation. ASBvisual-Handover-Completion-G…

Waste Management

Asbestos waste generated during the project was managed through controlled waste arrangements. The photographic record shows a dedicated external asbestos waste container securely segregated and clearly identified with asbestos warning signage.

The completion documentation confirms that the required waste consignment note was completed. ASBvisual-Handover-Completion-G…

Project Outcome

The works were successfully completed and the areas were handed back in a clean and safe condition.

The final BR Asbestos inspection confirmed that:

✓ Remedial works were completed to a satisfactory standard
✓ Waste documentation was completed
✓ The work area was suitable for reoccupation
✓ Completion documentation was issued to the client

The final supervisor sign-off was completed by Matt Eyre on 21 June 2025, with the completion documentation subsequently emailed to the client. ASBvisual-Handover-Completion-G… ASBvisual-Handover-Completion-G…

Key Project Figures

84m² of AIB removed
20m² of bitumen adhesive treated/removed
Amosite asbestos identified
123 photographs documenting the works
100% completion score with 0 flagged items and 0 outstanding actions ASBvisual-Handover-Completion-G…

BR Asbestos Limited

This project demonstrates BR Asbestos Limited’s capability to manage large-scale asbestos removal within operational industrial and commercial environments, from initial segregation and enclosure construction through controlled removal, cleaning, inspection, waste management and final handover.

Our focus throughout every project remains the same:

Safety without compromise.